T
This side return extension will transform the lower ground floor into a large, bright, open-plan kitchen/dining area.
The project includes a bespoke kitchen with microcement worktop, microcement flooring, and large rooflights to maximise the natural light coming in.
The property is in Clapton E5 and the project is expected to take 4.5 months to complete.